Dunnow Street Reconstruction – Village of Athens

Dunnow Street is an urban street in the Village of Athens. The existing roadway had deteriorated and was patched several times. The Village wanted to add a sidewalk to one side for safety pedestrian traffic. The roadway had a super-elevated cross-section to account for the grade change from one side to the other. MTS provided services to prepare construction plans, prepare public bid documents, collect bids, contract administration, and construction monitoring. The end product increased drainage while incorporating existing driveway grades, new sidewalk, and improved road substructure.

Before:
Dunnow Street Athens - Before

After:
Dunnow Street Athens-After

Central Waters Brewing Co. – Village of Amherst

Central Waters Brewing added a front entrance and detached storage building. The front entrance included an office, meeting room, reception area, kitchen, and outdoor seating. The detached storage building is a pre-engineered metal building for storage of finished product. MTS provided services for the building and structural design, and submittal to State Building Plan Review.

Central Waters Brewing Co Inside Amherst

Central Waters Brewing Co Amherst

Calvary Temple Assembly of God – Town of Peshtigo

The Calvary Temple Assembly of God new church building is a phased build-out. The initial phase includes 20,744 square feet of space for a multi-purpose room, child center, kitchen, classrooms, and offices. A future phase will include a sanctuary. The building is constructed of masonry walls and wood trusses. MTS provided services for the site plan layout, grading plan, building and structural design, and submittal to State Building Plan Review.

Calvery Temple Church Peshitgo

Town of Ringle – 2nd Avenue Reconstruction

2nd Avenue was an urban street, a section of Old State Highway 29, in the Town of Ringle. The existing roadway was blacktop over concrete, had no curb and gutter, and poor drainage. MTS provided services to prepare construction plans, storm water management plan, prepare public bid documents, collect bids, contract administration, and construction monitoring. The end product increased drainage while incorporating existing driveway grades, and improved road substructure.

Before:
2nd Ave Ringle Before

After:
2nd Ave Ringle After