Peaceful Valley Pavilion – City of Antigo

Peaceful Valley Pavilion is an outdoor event facility in the City of Antigo. The pavilion is located in the Rockin’ Robin Park on Field Street. Uses for the pavilion include a farmer’s market, sheltered concerts, and covered ice skating rink. MTS provided services for the site plan layout, building and structural design, 3D renderings, specifications, public bid process, submittal to State Building Plan review, and contract administration.

Peaceful Valley Pavilion Antigo 3D VIEW 2

Northcentral Technical College – City of Wausau

The sidewalk coverings at the Northcentral Technical College Wausau campus extend over 700 feet long. The coverings shield pedestrians travelling between buildings in three different locations. MTS provided services for the site plan layout, building and structural design, 3D renderings, specifications, public bid process, submittal to City of Wausau Plan review, and contract administration.

Sidewalk Coverings Rendering NTC

Sidewalk Covering construction NTC

Sidewalk Covering NTC

Merrill Airport Terminal – City of Merrill

The terminal building is located at the north end of Champagne Drive. The building is a 2,832 square feet wood framed building with amenities for pilots, passengers, and staff. MTS provided services for the site plan layout, building and structural design, specifications, public bid process, submittal to State Building Plan review, and contract administration.

Merrill Terminal Airport

Central Waters Brewing Co. – Village of Amherst

Central Waters Brewing added a front entrance and detached storage building. The front entrance included an office, meeting room, reception area, kitchen, and outdoor seating. The detached storage building is a pre-engineered metal building for storage of finished product. MTS provided services for the building and structural design, and submittal to State Building Plan Review.

Central Waters Brewing Co Inside Amherst

Central Waters Brewing Co Amherst

Calvary Temple Assembly of God – Town of Peshtigo

The Calvary Temple Assembly of God new church building is a phased build-out. The initial phase includes 20,744 square feet of space for a multi-purpose room, child center, kitchen, classrooms, and offices. A future phase will include a sanctuary. The building is constructed of masonry walls and wood trusses. MTS provided services for the site plan layout, grading plan, building and structural design, and submittal to State Building Plan Review.

Calvery Temple Church Peshitgo